Click to Home
Go To Search
RSS Feeds
Print PageEmail Page
Be SocialFacebookTwitter
Fee Schedule
 

This schedule sets forth charges which are assessed for certain services and activities performed by the Dixon Fire Department. It also provides for specific periods of time when Fire Department personnel and equipment are required by law or specifically requested by a private party to remain on duty in a standby status at a fixed location or locations away from the Dixon Fire Station. The term “law” is defined as any statute or regulation of the State of California, and any ordinance, resolution, or policy approved by Dixon City Council.


FIRE PROTECTION SYSTEM PLAN REVIEW

 


 


          (Fees to be paid when plans are  submitted)

 


 


Type of Project

Fee(s)


 

A

Kitchen hood systems

$176.00


 


    includes plan review and one inspection*



 

B

Underground water mains for commercial fire sprinklers

$267.00


 


    includes plan review, hydrostatic test and final inspection*



 

C

Fire sprinkler systems



 


          includes plan review, hydrostatic test and final inspection*



 


          1 - 100 sprinklers

$176.00


 


          101 - 200 sprinklers

$399.00


 


          201 - 400 sprinklers

$490.00


 


          > 400 sprinklers

$570.00


 

D

Fire alarm system

$176.00


 


    includes plan review, final inspection* 



 

E

Tank removal or installation

$176.00


 


    includes plan review, final inspection* 



 

F

Other fire protectin systems

$176.00


 


   (i.e. clean agent, carbon dioxide)



 


    includes plan review, final inspection* 



 

G

Special inpsections and re-inspections

$91.00


 


   are billed at the rate of $91.00 per hour and include driving time



 

H

Residential construction

$119.00


 


Includes plan review and inspection within Dixon Fire Protection



 


District only



 

I

Commercial construction

$239.00


 


Includes plan review and inspection within Dixon Fire Protection



 


District only



 


* Additional inspections are billed at $91.00 per hour



 





 


FIRE SERVICE FEES

 

 

 


(Fees based on actual usage and are calculated and paid after service is rendered)

 

 


All fees cover cost of use and depreciation of equipment, or personnel salaries, 

 

 


as appropriate.  Fees are assessed for suppression of fires caused by negligence, by violation of law, or by extreme carelessness as provided by law, and for required standby services.

 

 


Equipment or Personnel

Fee(s)

 

 

A

Staff vehicle

$22.00

per hour

 

B

Utility vehicle

$22.00

per hour

 

C

Pumper (Engine)

$36.00

per hour

 

D

Water Tender

$36.00

per hour

 

E

Aerial Ladder

$36.00

per hour

 

F

Specialized Apparatus

$36.00

per hour

 

G

Manpower - on duty (Captain)

$95.00

per hour

 

H

Manpower - on duty (Firefighter/Paramedic)

$75.00

per hour

 

I

Manpower - off duty (computed by 1.5 times on-duty rate)

1.5 times

 

 


 

on-duty rate

per hour

 

J

Manpower - other

$40.00

per hour

 





 


FIRE CODE OPERATIONAL PERMIT FEES

 

 

 


Operational permits allow applicants to conduct an operation or a business.

 

 


Fees to be paid at time of application for permit.


 

 


Fee covers inspection of condition or process and completion of permit form.

 

 


* References Section 105.6, Title 24, Part 9 of the California Code 

 


of Regulations (2010 California Fire Code) as adopted by reference in Section 16.02.020 of Chapter 16.02 of the Dixon Municipal Code.

 


  

 




 

 


Permits

Permit Identifier*

Fee(s)

 

A

Aerosol products

105.6.1

$28.00

 

B

Amusement buildings

105.6.2

$57.00

 

C

Aviation facilities

105.6.3

$57.00

 

D

Operate a carnival or fair

105.6.4

$57.00

 

E

Cellulose nitrate film

105.6.5

$28.00

 

F

Combustible dust-producing operations

105.6.6

$57.00

 

G

Combustible fibers

105.6.7

$28.00

 

H

Compressed gases

105.6.8

$57.00

 

I

Covered mall buildings

105.6.9

$85.00

 

J

Store cryogenic materials

105.8.10

$28.00

 

K

Cutting and welding 

105.6.11

$28.00

 

L

Operate a dry cleaning plant

105.6.12

$28.00

 

M

Exhibits and trade shows

105.6.13

$28.00

 

N

Store explosives or blasting agents

105.6.14

$57.00

 

O

Fire hydrants and valves

105.6.15

$28.00

 

P

Flammable and combustible liquids

105.6.16

$28.00

 

Q

Floor finishing

105.6.17

$28.00

 

R

Fruit and crop ripening

105.6.18

$28.00

 

S

Fumigation and thermal insecticidal fogging

105.6.19

$28.00

 

T

HPM facilities

105.6.21

$57.00

 

U

High-piled storage

105.6.22

$28.00

 

V

Hot work operations

105.6.23

$28.00

 

W

Industrial ovens

105.6.24

$28.00

 

X

Lumber yards and woodworking plants

105.6.25

$57.00

 

Y

Liquid- or gas-fueled vehicles or equipment in assembly buildings 

105.6.26

$28.00

 

Z

LP-gas

105.6.27

$28.00

 

AA

Magnesium

105.6.28

$28.00

 

BB

Miscellaneous combustible storage

105.6.29

$28.00

 

CC

Open burning (Burn Permit)

105.6.30

$25.00

 

DD

Open flames and torches

105.6.31

$28.00

 

EE

Open flames and candles 

105.6.32

$28.00

 

FF

Organic coatings

105.6.33

$28.00

 

GG

Places of assembly

105.6.34

$57.00

 

HH

Private fire hydrant

105.6.35

$28.00

 

II

Pyrotechnic special effects material

105.6.36

$57.00

 

JJ

Pyroxylin plastics

105.6.37

$28.00

 

KK

Refrigeration equipment

105.6.38

$28.00

 

LL

Repair garages and motor fuel-dispensing facilities

105.6.39

$28.00

 

MM

Rooftop heliports

105.6.40

$28.00

 

NN

Spraying or dipping

105.6.41

$28.00

 

OO

Storage of scrap tires and tire byproducts

105.6.42

$28.00

 

PP

Temporary membrane structures, tents and canopies

105.6.43

$57.00

 

QQ

Tire-rebuilding plants

105.6.44

$57.00

 

RR

Waste handling

105.6.45

$28.00

 

SS

Wood products

105.6.46

$57.00

 

TT

Battery system

105.6.48

$28.00

 

UU

Christmas tree sales

105.6.49

$28.00

 

WW

Firework aerial display

105.6.50

$85.00

 

XX

Liquified petroleum gases

105.6.51

$28.00

 

YY

Model rockets

105.6.52

$28.00

 

ZZ

Temporary fire department access road for construction 

105.6.53

$57.00

 

AAA

Temporary water supply

105.6.54

$57.00

 

BBB

Tire storage

105.6.55

$85.00

 

 


FIRE CODE CONSTRUCTION PERMIT FEES



 


Construction permits allow the applicants to install or modify systems and equipment.

 

 

 


(Fees to be paid at time of application for permit)



 


Fee covers inspection of condition or process and completion of permit form.

 


* References Section 105.7, Title 24, Part 9 of the California Code 

 




of Regulations (2010 California Fire Code) as adopted by reference in Section 16.02.020 




of Chapter 16.02 of the Dixon Municipal Code.





Permits

Identifier*    Fee(s)

A

Automatic fire-extinguishing systems

105.7.1

$28.00


B

Battery systems

105.7.2

$57.00


C

Compressed gases

105.7.3

$57.00


D

Fire alarm and detection systems and related equipment

105.7.5

$28.00


E

Fire pumps and related equipment

105.7.6

$28.00


F

Flammable and combustible liquids

105.7.7

$28.00


G

Hazardous materials

105.7.8

$57.00


H

Industrial ovens

105.7.9

$28.00


I

LP-gas

105.7.10

$28.00


J

Private fire hydrants

105.7.11

$28.00


K

Spraying and dipping

105.7.12

$57.00


L

Standpipe systems

105.7.13

$28.00


N

Temporary membrane structures, tents and canopies

105.7.14

$57.00


O

Demolition of a building

105.7.15

$28.00


P

Security gates

105.7.16

$28.00


Q

Water supply for fire protection

105.7.21

$57.00


 




Contact
Andi Horigan
Administrative Manager
Email 

205 Ford Way
Dixon, CA 95620
Click for map

Ph: (707) 678-7060
Fx: (707) 678-4251

Hours
24 hours a day, 7 days a week

Office Hours
Monday through Friday, 8:00am to 5:00pm, excluding holidays

Dixon Fire Department Patch